BLOK-LOK Home | About | Contact Us | H-B.com
Featured Projects

Water Tower Place

Chicago, Illinois
The thin marble panels required re-affixing to this high-rise structure in the least invasive way while optimizing the load bearing performance of the connection ...


Read More
Featured Projects

Union Station

St Louis, Missouri
A historical building in the heart of St Louis, Union Station required an effective stabilization solution for its aging masonry ...



Read More
Featured Projects

SUNY Maritime College

New York, New York
The building façade at SUNY Maritime College in New York City required eventual replacement of the shelf angles – however an interim solution was needed which would provide stability before and during future construction ...


Read More
Featured Projects

One Shell Square

New Orleans, Louisiana
The extremely hard concrete in Louisiana precluded the use of SPIRA-LOK® Helical Ties originally intended for this project. The integrity of the connection in the veneer stone ...


Read More
Featured Projects

Miami Center

Miami, Florida
Situated directly on the coast in Miami, Florida, the Citibank Tower was regularly subject to extremely high wind loads, sometimes reaching hurricane force – presenting a formidable stabilization challenge ...


Read More
Featured Projects

Alice Tully Hall, Juilliard School

New York, New York
The thin travertine panels required re-affixing to the poured concrete structure in the most unobtrusive way to preserve the aesthetics of the building ...



Read More
Featured Projects

City Hall

Charleston, South Carolina
The multi-wythe brick structure was to be strengthened to withstand a seismic event by installing a poured concrete frame inside the building. This concrete frame had to be tied into the existing structure...


Read More
Featured Projects

5 Post Oak

Houston, Texas
Engineers of this 22-storey travertine-clad tower in Houston, Texas required a solution that would deliver robust stabilization ...



Read More
Featured Projects

365 5th Avenue

New York, New York
A historical building in the heart of Manhattan, 365 5th Avenue required an effective stabilization solution for its aging masonry – a solution that would minimize damage done to its unique brickwork ...


Read More

SPIRA-LOK™

The Spira-Lok™ mechanical anchoring system is a simple and cost-effective method of re-connecting existing veneers to various substrates – eliminating the need to tear down existing...

Read More

TORQ-LOK®

The Torq-Lok® mechanical anchoring system is a simple and cost-effective method of re-connecting existing veneers to various substrates – eliminating the need to tear down existing...

Read More

SPIRA-LOK™

The Spira-Lok™ mechanical anchoring system is a simple and cost-effective method of re-connecting existing veneers to various substrates – eliminating the need to tear down existing...

Read More

System 2000

SYSTEM2000 incorporates a unique adjustable tie (Patented) with our traditional adjustable reinforcing systems. The unique shape allows for...

Read More

Arbortech AS160

The award-winning AS160 Brick + Mortar Saw featuring Allsaw Technology™ represents a revolution in cutting technology. Using a unique patented orbital cutting motion...

Read More

BL407

An innovative wire tie and plate combination system for anchoring veneers, BL407 anchors to the surface of sheathing or stud, providing adjustability, minimal free-play, strength, stiffness and corrosion resistance – all while maintaining the integrity of air barriers.

Read More

BL507

An adjustable anchor and tie system for use in masonry cavity wall construction, BL507 is designed to meet building codes while allowing for vertical differential movement between wythes.

Read More

BL607

An innovative wire tie and plate combination system for anchoring veneers, BL607 anchors to the surface of the stud, providing adjustability, minimal free-play, strength, stiffness and corrosion resistance.

Read More

MOR-CONTROL™

Mor-Control is manufactured from corrugated polypropylene-copolymer plastic. The fabricated shape slopes to shed moisture while the tabs project to lay in bed joint to suspend Mor-Control in cavity. The ends are fastened with nickel-zinc plated fasteners.

Read More

CELL-VENT™

Cell-Vent is manufactured from flexible ultra-violet resistant polypropylene-copolymer plastic. Cell-Vent maximizes cavity air flow and drainage with 60% free area, limits insect access, and keeps head joint free of mortar.

Read More

System 2000

SYSTEM2000 incorporates a unique adjustable tie (Patented) with our traditional adjustable reinforcing systems. The unique shape allows for...

Read More

Through our vast experience, unmatched technical expertise and a continued dedication to partnership, BLOK-LOK® Limited has grown to become a leading manufacturer and supplier of masonry reinforcing systems and ties.

Read More

HOHMANN & BARNARD acquires BLOK-LOK LTD

Hohmann and Barnard, Inc. , a Mitek / Berkshire Hathaway Company, (a subsidiary of Warren Buffett’s Berkshire Hathaway, Inc.), and the leading manufacturer of reinforcement, anchoring systems and accessories for masonry and stone, has acquired Blok-Lok, Ltd.

Read More

 

COPYRIGHT © 2007, BLOK-LOK® LIMITED, All Rights Reserved. Home | Products | Projects | Downloads | Links | Contact Us
  Website by: Nexvision